Wood stove owner
For the wood stove owner
One Lopi Answer freestanding wood stove in the living room. The chimney / flue sweep + inspection every 12 months on a calendar line, the door gasket / glass check every Saturday during burn season, the ash drawer emptied when it fills. Tell Muse the last sweep and its date. The board does the arithmetic.
One wood stove on the board. Chimney / flue sweep + inspection on the Lopi Answer every 12 months, on a calendar line. Door gasket / glass clean check every Saturday during burn season, on its own weekday line. The ash drawer emptied when it fills. That is the whole list, and it lives on one due board.
You know the last sweep. The chimney and flue were swept and inspected at Always Ridge Chimney Care on October 18, 2025, and the invoice said $275. Say that date to Muse once and the row is written. The next sweep comes due on October 18, 2026, and Maintenance Due counts the leftover days on the calendar. Book Always Ridge Chimney Care for that week and the first fires burn on a clean flue.
Before the weekend, ask Muse what's due on the Lopi Answer. The gasket / glass check comes back with Saturday on its own line. The sweep comes back with October 18, 2026 and the days left. Maintenance Due subtracts on the calendar and names what is left, and no model sits in the due path.
The calendar lines keep their dates. The chimney / flue sweep is every 12 months: brush, creosote check, cap and damper inspection. The burn season you lit a week late does not slide next October's date. The door gasket / glass clean check is every Saturday: dollar-bill test on the gasket, ash wiped off the glass, latch feel. The Saturday a skipped weekend eats does not push the check into the week. A late tick is logged when it happened; the cadence does not move. These are the cadences you told Muse, not spec-sheet promises.
The ash drawer stays off the arithmetic. Empty it when it is full, log the tick, and the sweep and gasket lines keep the dates you set.
The firewood gets a line too. Tell Muse the stack should burn between 15% and 20% moisture, and log each moisture-meter reading as you take it. A 22% reading comes back due: 2 points over the 20% ceiling, still too wet. Inside the band, ask what's due and the board names the edge you are closer to and the points left: a 19% reading is 1 point under the 20% ceiling, a 16.5% reading is 1.5 points above the 15% floor.
When the stack is drying toward that nearer edge, the board puts a date on it at the pace it has been drying. From 24% at the August 1 split down to 16.5% on September 20 is 0.15 points a day, so the 15% floor comes due September 30. A stack drying away from the nearer edge gets no date, not a guess borrowed from the far edge. Ask what is within 2 points of an edge and the 19% stack comes back; a 17.5% stack, 2.5 points from either edge, does not.
The sweep can count cords as well as days. Tell Muse the sweep is due on the October date or after 1.5 cords burned since the last one, whichever comes first, and log the running count of cords as you burn them. At 1.2 cords the row shows 0.3 cords left next to the days to October 18. Burn 1.6 cords before the date and the sweep is due now, 0.1 cords past, with the October date still on the row.
Your chimney sweep preference is one ask too. Say it once: Always Ridge Chimney Care on the Lopi Answer. Muse writes it, and the next sweep booking starts at Ridge Chimney Care without you naming the shop again.
The board can call ChatGPT too. Subscribe once and ChatGPT hears when a logged tick puts the sweep or the gasket check on the board, in a signed webhook naming the job and how late. You did not have to ask first.
The day the wood stove sells, say it once: sold. Muse archives the wood stove and the due board drops it that day. Every sweep row, gasket check, and ash tick you logged stays in the history. If the deal falls through, one ask puts it back on the board.
The house log on /home-maintenance-checklist shows how calendar rows look. Copy the prompt on /for-your-agent and paste it into Muse. Free.